Resources | Subject Notes | Information Technology IT
This section details various strategies employed to ensure business continuity in the event of a disruptive incident. A robust disaster recovery plan (DRP) is crucial for minimizing downtime and data loss.
A disaster recovery plan outlines the procedures and resources needed to restore critical business functions after a disaster. The primary goals of a DRP are:
A comprehensive DRP typically includes the following components:
Several distinct disaster recovery strategies are available, each with its own advantages and disadvantages. The choice of strategy depends on factors such as budget, Recovery Time Objective (RTO), and Recovery Point Objective (RPO).
This is the most basic disaster recovery strategy. It involves regularly backing up critical data to a separate storage location and restoring it in the event of a disaster.
Strategy | Description | Advantages | Disadvantages |
---|---|---|---|
Backup and Restore | Regularly copying data to a separate storage location. | Simple to implement, relatively inexpensive. | Can have a long RTO, potential for data loss if the last backup is outdated. |
This strategy extends the backup and restore approach by storing backups at a physically separate location from the primary site. This protects against localized disasters such as fire or theft.
Virtualization allows for the creation of virtual machines (VMs) that can be easily replicated to a secondary site. Replication ensures that the VMs are kept up-to-date with the primary VMs.
Strategy | Description | Advantages | Disadvantages |
---|---|---|---|
Virtualization with Replication | Replicating virtual machines to a secondary site. | Faster RTO than backup and restore, reduced data loss. | Requires significant investment in virtualization infrastructure. |
A hot site is a fully equipped duplicate of the primary site, ready to take over immediately in the event of a disaster. It includes hardware, software, and data, and is constantly synchronized with the primary site.
Strategy | Description | Advantages | Disadvantages |
---|---|---|---|
Hot Site | A fully equipped duplicate site ready for immediate takeover. | Very fast RTO, minimal data loss. | Expensive to maintain. |
A warm site is a partially equipped duplicate site. It has some hardware and software installed, but data needs to be restored from backups. It is less expensive than a hot site but has a longer RTO.
Strategy | Description | Advantages | Disadvantages |
---|---|---|---|
Warm Site | A partially equipped site requiring data restoration. | Lower cost than a hot site, faster RTO than backup and restore. | Longer RTO than a hot site, potential for data loss. |
A cold site is a basic facility with power, cooling, and network connectivity. It does not have any hardware or software installed, so data needs to be restored from backups and systems rebuilt.
Strategy | Description | Advantages | Disadvantages |
---|---|---|---|
Cold Site | A basic facility requiring full setup and data restoration. | Least expensive option. | Longest RTO, significant data loss potential. |
RTO and RPO are critical parameters in disaster recovery planning:
Regular testing of the DRP is essential to ensure its effectiveness. Tests should simulate different disaster scenarios and verify that recovery procedures work as expected. The DRP should also be reviewed and updated regularly to reflect changes in the business environment and technology.